  COMMISSIONING
 
Commissioning primary equipment, electrical protection & control in power
  plants, substations (transmission and distribution) and industrial objects
  Primary equipment:
  - Power transformers
  - AC motor drives
  - Current transformers and voltage transformers
- Switchgears
- Circuit breakers
  - HV cables
- Surge arresters
- AC/DC distribution boards
- Batteries
- UPS
- Performing primary and functional tests
- Preparing energizing procedures
Electrical protection:
- Line protection
  - Busbar protection
- Transformer protection
- Motor protection
- Capacitor bank protection
- Generator protection
- Performing relay secondary injection tests, primary and functional tests
Electrical control:
- Control of HV & LV apparatus including all interlockings
- Automatic generator synchronisation
  - Automatic change over in substations
- Automatic voltage regulation for transformers with tap changers
- Preparing energizing procedures
 
SUPERVISION
Supervision of erection, commissioning and energizing in power plants, substations (transmission and distribution) and industrial objects
- Primary equipment
- Protection & control
   
DESIGN
Design electrical protection & control in power plants and substations
(transmission and distribution) and industrial objects
- Basic design
- Detail design
- Protection calculation studies
- Parametrization of relays
- Line protection
  - Busbar protection
- Transformer protection
- Motor protection
- Capacitor bank protection
- Generator protection
 
 
 
 
 
 